Rocky View County, Alberta

Proposed
Gayford
Facility

An integrated natural gas-fired power generation and on-site data processing project by Armada Nowlit Energy. The current design brings nine generator units and nine data processing modules together on one compact site.

The project remains subject to municipal and other required approvals.

Conceptual oblique view of the proposed Gayford Facility with surrounding farmland and perimeter planting
Illustrative concept · July 2026 MSDP
18 MWProposed installed generating capacity
9 + 9Generator units + data processing modules
1.815 haSurveyed plant site · plus 0.091 ha access road
Project overview

A compact site.
A rural setting.

The proposed facility is approximately 16 km southeast of Irricana, immediately north of an existing Ember Resources natural gas compressor station. The remainder of the agricultural parcel is intended to remain in agricultural use.

  • Legal locationNW ¼ Section 35, Township 26, Range 25, W4M
  • Road accessRange Road 252, using an existing approach and shared private access
  • Power useElectricity consumed on site, with no grid connection or export proposed
  • OperationsRemote monitoring with periodic inspection and maintenance visits
Local context map showing the proposed Gayford location north of the existing compressor station
Local context map. Source: MSDP, Figure 2. Select the image for a larger view.
Facility design

Generation and data.
One coordinated site.

The current concept combines enclosed generation, modular computing, emissions controls, electrical distribution and secured access within a defined development footprint.

Power generation

6 × 1.9 MW
3 × 2.2 MW

Nine natural gas generator units provide a combined installed generating capacity of 18 MW under the current MSDP design.

Data processing

Nine modular
containers

Modular containers accommodate the on-site computing infrastructure supplied by the proposed generation facility.

Engine cooling

Closed-loop.
Dry heat rejection.

Engine cooling fluid recirculates through sealed circuits and liquid-to-air radiators. The proposed system does not use cooling towers.

Gas supply

Pipeline tie-in

Pipeline supply avoids routine fuel-truck deliveries. Detailed connections and access-crossing arrangements remain subject to the applicable review processes.

Emissions controls

SCR + monitoring

The MSDP proposes selective catalytic reduction on all nine generators, supported by predictive emissions monitoring and applicable approval requirements.

Operating model

Remotely monitored

Continuous remote monitoring, controlled access and periodic maintenance visits support an operating model with no permanent on-site staff.

Gayford concept site plan showing generator and data processing equipment north of the existing Ember facility
Concept site plan from MSDP Figure 7. Equipment labels and layout are conceptual and remain subject to detailed design.
Community considerations

Noise, air,
water and traffic.

Technical assessments and design measures described in the MSDP support review of the proposal. Modelled results describe the assessed design, rather than measurements from an operating Gayford facility.

01

Noise

The MSDP reports that the noise assessment predicts compliance with applicable AUC Rule 012 limits at assessed receptors. Final equipment and operating arrangements must meet the applicable requirements.

40 dBA · stated nighttime design criterion
02

Air quality

The assessment summarized in the MSDP includes background concentrations and the adjacent compressor station. Reported modelled nitrogen dioxide results are below the applicable objectives using the assessment’s stated statistical measures.

Modelled assessment · emissions controls proposed
03

Water

No permanent municipal water or wastewater connection is proposed. Transported drinking water and contractor-serviced portable sanitation are planned for construction and maintenance personnel. Engine cooling uses dry heat rejection.

No permanent municipal water or wastewater service proposed
04

Traffic

Normal operations are expected to generate one to three maintenance, inspection or service visits per day. Construction deliveries will be managed through approved routing and road-use requirements.

Approximately 2–6 one-way vehicle trips per operating day
Site layout & landscaping

A considered edge
to the farmland.

The landscape concept concentrates native or drought-tolerant planting along the western and southern boundaries. Screening, shielded lighting and controlled access are intended to limit off-site effects while maintaining emergency access and drainage.

Conceptual aerial rendering showing the Gayford Facility and proposed perimeter landscaping
Conceptual aerial rendering and proposed landscaping. MSDP Figure 12.

These illustrations are conceptual, not construction drawings or photographs of a completed Gayford facility. Final planting, equipment and layout details will be established through development permitting and detailed design.

Safety & long-term stewardship

Planned for operation.
And eventual closure.

The MSDP sets out emergency response, monitoring and reclamation commitments for the proposed facility’s operating life and eventual closure.

Emergency readiness

Access and response

Remote alarms, shutdown procedures, controlled responder access and coordination with local emergency services are planned before commissioning.

Ongoing operation

Monitor and maintain

Operational monitoring, emissions controls, maintenance records and complaint-response procedures support ongoing compliance.

Reclamation

Return to agricultural use

Following permanent closure, equipment and associated infrastructure are intended to be removed and disturbed land reclaimed for agricultural use or tame pasture.

Approvals & next steps

Subject to
required approvals.

Development will proceed through the applicable planning, permitting and technical review processes. Construction and operation remain subject to the required authorizations.

01 / REVIEW

Planning and regulatory review

Municipal land-use review and applicable provincial approvals.

02 / DESIGN

Detailed design and permitting

Site layout, drainage, access, landscaping, lighting and emergency response arrangements.

03 / DELIVERY

Construction and commissioning

Implementation of approved plans and completion of required pre-operation checks.

Project documents

The detail behind
the proposal.

Read the full Master Site Development Plan for the project’s site context, development concept, technical summaries, consultation and implementation commitments.

JULY 2026 · PDF · 40 PAGES

Master Site Development Plan

Gayford Data Processing Facility — prepared by VL Energy on behalf of Armada Nowlit Energy.

Read the MSDP ↗
Project enquiries

Questions about
the proposal?

Contact Armada Nowlit Energy for project information and enquiries.

Armada Nowlit EnergyLet’s stay in touch.

Project information and community enquiries

ANE.Info@Armada-Nowlit.COM

Need Help To Maximize Your Business?

Reach out to us today and get a complimentary business review and consultation.